Saiz Teks
Malay Arabic Chinese (Simplified) English

Alternative flash content

Requirements

WAKTU OPERASI KAUNTER PERUMAHAN

Ahad- Khamis

8.00 pg - 12.00 tgh

2.00 ptg - 3.30 ptg

 -

WAKTU BEKERJA

Ahad- Rabu

8.00 pg - 1.00 tgh

2.00 ptg - 5.00 ptg

Rehat

1.00 tgh - 2.00 ptg

 

Khamis

8.00 pg - 1.00 tgh

2.00 ptg - 3.30 ptg

Rehat

1.00 tgh - 2.00 ptg

 

HARI BERSAMA PELANGGAN

Setiap Rabu

9.00 pg - 12.00 tghari

 -

----------------------------------------------------------------------------

 

 

31 Oct, 2014

Industri Utama

SENARAI KAWASAN-KAWASAN PERINDUSTRIAN UTAMA DI NEGERI KEDAH

 

BIL

 

KAWASAN INDUSTRI DI BAWAH URUS TADBIR

 

KELUASAN YANG DI MAJUKAN

(EKAR)

 

 

JUMLAH KILANG BEROPERASI
(LOT)

1.

Perbadanan Kemajuan Negeri Kedah (PKNK)

   

 

Kulim

430.16

83

 

- Sungai Petani

622.31

156

 

- Bakar Arang

558.28

103

 

- Tikam Batu

89.10

23

 

- Mergong 2

102.35

113

 

- Mergong Barrage

100.49

128

 

- Kuala Ketil

332.00

54

 

- Bukit Kayu Hitam

348.4

76

 

- Gurun

376.82

18

2.

Kawasan Perindustrian Kulim Hi-Tech Park

4,032.00

24

3.

Kawasan Perindustrian Bandar Darulaman

(Darulaman Realty Sdn. Bhd.)

120

71

4.

Kawasan Perindustrian MIEL Sungai Lalang, Sungai Petani

(5 Fasa)

103.59

84

(Termasuk

5 lot industri)

 

Maklumat Tambahan :-

- Adalah dimaklumkan bahawa pihak KHTP kini dalam proses pembesaran Kawasan Industri mereka bagi Fasa 4 yang dianggarkan berkeluasan 410.611 ekar.

- Proses ke arah merealisasikan hasrat ini telah dimajukan oleh UPEN bagi pihak Kerajaan Negeri kepada PTG Negeri Kedah untuk tindakan selanjutnya pada 11 Januari 2011.

- Dianggarkan terdapat sejumlah 10,897orang pekerja industri di Negeri Kedah Darul Aman (Sumber: Statistik 2009 Negeri Kedah Darul Aman).